Boker Long Lead EDC
About Boker Long Lead EDC
The Long Lead EDC pocket knife from Boker Magnum is an attractive, MODern slip joint knife that is great for everyday use. The knife has a sleek, classy appearance and will slide comfortably into your pocket with the tip-down pocket clip, ready to meet your cutting needs. If you are looking for afFordable, interesting designs, be sure to check out more of our Boker Magnum Folding Knives.
Boker Long Lead EDC For Sale
Most Popular Folding Knives
Fox Knives Marina Tedesca
The Fox Sailing knife is outfitted with a slip joint stainless steel... read more
Fox Knives Sierra Tactical Rescue
The Sierra Tactical Rescue knife is a proficient knife, with features that... read more
Fox Knives BF-73
This Blackfox folding knife offers a durable design, built to withstand your... read more
Victorinox One Hand Sentinel
The Victorinox Sentinel knife. Functionality meets accessibility with contoured, no-slip handles, handy... read more
Fox Knives Advance Combat Diver
The A.C.D. (Advance Combat Diver) knife is a liner lock folding knife... read more
$39.95
$27.97
$29.96
Specifications |
|||
|---|---|---|---|
| Brand | Boker | ||
| Category | Folding Knives | ||
| Overall Length | 7.125" | ||
| Blade Length | 3.125" | ||
| Cutting Edge | 3.00" | ||
| Blade width | 0.75" | ||
| Blade Thickness | 0.73" | ||
| Blade Material | 7Cr17MoV | ||
| Blade Style | Spear Point | ||
| Blade Grind | Flat | ||
| Finish | Satin | ||
| Edge Type | Plain | ||
| Handle Length | 4.00" | ||
| Handle Width | 0.75" | ||
| Handle Thickness | 0.41" | ||
| Handle Material | G-10 | ||
| Color | Black | ||
| Frame/Liner | Stainless Steel | ||
| Weight | 2.70 oz. | ||
| User | Right Hand | ||
| Pocket Clip | Tip-Down | ||
| Knife Type | Manual | ||
| Opener | Nail Nick | ||
| Lock Type | Slip Joint | ||
| Model | Long Lead EDC | ||
| Model Number | 01SC080 | ||
| Country of Origin | China | ||
| Best Use | Everyday Carry | ||
| Product Type | Knife | ||
Daily Deals
Boker Long Lead EDC Questions and Answers
No Questions Yet.